Floor Framing Plans
Last updated October 11, 2024
By Emma Howland
Properties
- View Range
- associated Level: Base of Footings looking UP for Main floor, T.O. Sheathing main floor for Upper floor
- Cut Plane: Cut through foundation walls looking up, set view limits high enough to see walls above
Lables/ Notes
- Floor sheathing thickness and nailing pattern
- Note any joist rollout obstacles to avoid (toilet flanges generally)
- Hangers
- Crawlspace access point (if through floor)
- Supporting posts
Dimensions
- Cantilevers, from face of core of support to outside edge of framing
- Span of each framing rollout, including intermediate supports along the way
- Openings in floor, if any (such as stairs, crawlspace access, laundry chutes)
Tags
- Anchors & Straps
- Shearwall tags (Plan tags)
- Existing framing rollouts
- New framing rollouts
- Posts and Post caps
- Girder beams and headers
Sheet Notes
- Fastener schedule
- Framing Notes
Recent Posts
Categories
- Calculation Templates (2)
- Civil Engineering (3)
- Derivations (8)
- Drafting Standards (15)
- Geotechnical Engineering (1)
- IT & Software Setup (5)
- Product Knowledge (9)
- Production Tutorial (7)
- Research Notes (9)
- Research Tips (1)
- Revit Tips (4)
- Stormwater (4)
- Structural Calculators (4)
- Structural Engineering (28)
- Structural General (11)
- Uncategorized (18)