Workset Management
Last updated October 11, 2024
By Emma Howland
Make a new Teamwork File:
- Save the design model with a final project name- example: “Emerson ADU Design 3.2” > “Emerson Residence Remodel & ADU”
- In the Collaborate tab open Worksets, click ok on the popup (do not change the “Editable” category yet)
- Save as on the Revit server
- Close the project, then open the project from the server version
- Open the worksets tab again and change the “editable” category to “No”, then synchronize with central
Spin off a design or back-up File:
- Save the teamwork file and close
- File>Open>Select Project from the Revit server but be sure to select the check box for “Detach from Central” before opening
- select >Detach and discard worksets in the popup window
- Save this detached copy in the CAD folder for the project with the date
Recent Posts
Categories
- Calculation Templates (2)
- Civil Engineering (3)
- Derivations (8)
- Drafting Standards (15)
- Geotechnical Engineering (1)
- IT & Software Setup (5)
- Product Knowledge (9)
- Production Tutorial (7)
- Research Notes (9)
- Research Tips (1)
- Revit Tips (4)
- Stormwater (4)
- Structural Calculators (4)
- Structural Engineering (28)
- Structural General (11)
- Uncategorized (18)